Bell Factory 1st Floor Expansion

Responsive image


Building Infrastructure Motorsport

Client: Bahrain International Circuit

Consulting engineer: Arab Architects

Period: 9 months

Completion: Sep 2024

Price: $2,941,200

Scope of Works

  • Construction of external new RCC foundations – Included in the Contract Price as per the Tender documents issued by the Engineer, Post Tender Meeting discussions / Agreement and No change in this Contractor’s Proposal.
  • Construction of external new RCC columns up to first floor level - Included in the Contract Price as per the Tender documents (up to first floor level only) issued by the Engineer, Post Tender Meeting discussions / Agreement and No change in this Contractor’s Proposal.
  • Dilapidation Survey of the existing building / structure including any alterations or repair to the existing structure – Allowed as a Provisional sum.
  • Design, Fabrication, Supply & Erection of Steel structure including the Primary and Secondary (Vertical & Horizontal) members as per this Contractor’s Proposal.
  • Supply and apply One Hour Intumescent Fire proof coating to Primary steel members, without any Galvanization.
  • Design, Fabrication, Supply and Installation of Metal Sandwich panel Roof with Fascia and Gutter.
  • Design, Fabrication, Supply & Installation of Platform at Roof for MEP Equipment with HDG grating.